
CVE
$90M Saved. Bureaucracy Cut. CVE Still Alive.
MITRE lost its grip, the government saved $90 million, and CVE didn’t die, it evolved. The so-called “planned transition” was a last-minute scramble that proves bureaucracy was the bottleneck all along.